How clean water
reaches a community.
A water point begins long before the first tap is turned. Follow the work, from the groundwater survey to the moment a community can collect water.

Stages of building a water point
- Stage 01
Find the water
A groundwater survey helps identify a suitable place to drill and estimate how deep the borehole may need to go.
Before we drillGood work starts with understanding the site.
- Stage 02
Bring the team to site
The drilling equipment arrives at the selected location, ready for work to begin.
- Stage 03
Begin drilling
The team drills into the ground to reach the water below.
Begin drillingThis video is currently unavailable. Please try again later.
- Stage 04
Complete the borehole
The drilled hole is ready for the next stage of the water system.
Complete the boreholeThis video is currently unavailable. Please try again later.
- Stage 05
Flush the borehole
Dirty water is drawn out as the team clears the newly drilled borehole.
Flush the boreholeThis video is currently unavailable. Please try again later.
- Stage 06
Lay the foundations
The foundations are built for the structure that will support the water tanks.
Lay the foundationsThis video is currently unavailable. Please try again later.
- Stage 07
Install the tanks
The water tanks are lifted into place on the supporting structure.
Install the tanksThis video is currently unavailable. Please try again later.
- Stage 08
Build the tap point
The faucet walls are built where people will come to collect water.
Build the tap pointThis video is currently unavailable. Please try again later.
- Stage 09
Turn on the water
The system is complete, and the community begins collecting water from the new water point.
Turn on the waterThis video is currently unavailable. Please try again later.